Biweekly 26
|
|
Date |
16 October 2020, 14:00 CEST |
Pre-meeting stakeholders’ reports
Peter Gorm Larsen
- Attending kick-off meeting for the UPSIM project this week
- Planning meeting with Rinkjøbing-Skjern municipality in two weeks time
- Involved in digital twin discussions related to the DIGITbrain project
- Ensured that Denmark will vote yes for 2 new ISO draft standards around digital twins
- Suggest to have a webinar on the 25th of November 2020 for the INTO-CPS Association posibilities (input welcome)
- In kick-off of UPSIM saw http://www.the-mtc.org/our-projects/simready which looks relevant in particular for our manufactoring research projects
- Suggest that someone in the group gather as many definitions of digital twins as possible. This could potentially turn into a technical report related to the differences depending upon different dimensions e.g. research/commercial, research focus and application domain.
Claudio Gomes
- Robot Manipulator Model calibrated (with Emil)
- FMI 3.0 Work on semantics of clocks (anybody interested in applying formal methods to fmi 3.0 clocks?)
- Reading up on optimal experimental design
Nick Battle
- Did some renaming and restructuring of the FMI2/3 VDM-SL models, with Kenneth.
- Completed and pushed a bugfix for more sensible function value comparisons (that works better with lambdas)
- Created first cut of POG methods in LSP Server for Jonas and Frederik
- Added some POs to VDMJ that were missing from Overture (to do with inv/post satisfiability)
- Helped Kenneth get annotations working (without using a plugin jar)
- Fixed FMI-2-VDM’s toVDM() method to return a String rather than print to stdout
- Look into an Overture bug of Leo’s that gets an incorrect warning for expressions like post_func[type].
Casper Thule
- Case study with Ken Pierce and Sam Hall on Digital Twin 3-joint robot arm.
- Working on release 1 of Maestro2
- Initiating proof of Mabl spec (termination)
- Implementing CI and deployment for FMI2/3 VDM-SL models
- Identified VDM2C issue - I am not continuing on this. What is the plan here? I think it is a pity to give up on this, as vdm2c creates MUCH better FMUs than overture toolwrapper and makes it possible to run it on microcontroller
Maurizio Palmieri
- Initiating proof of Mabl spec (termination) in UPPAAL with Casper
- Studying the DSE scripts for genetic algorithm (sounds close the the third point of Claudio)
- Finalizing the paper on formal analysis of drones at unipi
Hugo Daniel Macedo
- Overture
- Working towards Overture 3.0.2 Release
- A release candidate was produced and Nick tests found issues, that I will go over starting next week.
- DT for water case
- I have been in a workshop organized by AVK https://www.avkventiler.dk/ as part of the the Danish Water Cluster initiave
- Next week I will participate in the kickoff of a platform for sharing data generated in the water sector: Innovationsdataplatform - Data Ecosystem Water workshop.
- INTO-CPS Application
- Regarding INTO-CPS. We were able to upgrade the Electron version to the latest version! From 6 to 10.1.3! It required sorting out troubles with the download manager and dialogs, but we are now done with it. Kristoffer solved an issue Mirgita found and we are now working towards a new release and unit testing.
- Looking forward to collaborate with Maurizio in the improvement of DSE. Kristoffer and Hao can also join to both extend the app and create a new DSE project with the scripts from the paper about time-delay.
- Other
- Working with Till on his survey on DT. Now and then he finds papers about digital twins in water, and I see good work comming out of the partnership in the long run.
Emil Madsen
- Developed - together with Claudio - a dynamic model (mapping between motion and joint torque/actuator current) of an arbitrary robot with revolute (rotational) joints
- The model is validated on the six axes Universal Robots UR5e robot arm
- Working on expressing the dynamic model linearly in a set of dynamic coefficients for easy identification
- When that’s done the rest of the work is easy and papers will be flowing
Hao Feng
- Been writing the technical report of the Incubator.
- Disscussed with Claudio about the details of the report.
Prasad Talasila
- There was round table discussion on DIGITbrain experiments that use the INTO CPS toolchain.
- No digital twin specific work in the last fortnight.
Sub-projects status
Sub-project X
Sub-project Y
Sub-project Z
Any Other Business
Next Meeting
27 October 2020, 14:00 CEST