Biweekly 2
|
|
Date |
21 August 2019, 1030 CET |
Participants |
Carlos H., Christian L., Hugo M., Jim W., Peter L.. Minutes by Hugo M. |
Pre-meeting stakeholder’s reports
Discussion points put forward by the participants. These should be filled in in advance.
Hugo
- Launched the minutes website.
- Prepared an example on how each stakeholder may report before each meeting.
- Launched several paper revisions.
- Is preparing the line following robot DT version with Christian L.
Meeting Summary
Round table
Hugo introduced stakeholders reports process
- Access https://digitaltwincentre.github.io/
- Go for Biweeklies
- Click on the link for the particular meeting.
- Scroll to the bottom and click edit.
- Add your topic and commit.
PGL reported:
- Posted 1-2 new positions at https://international.au.dk/about/profile/vacant-positions/job/postdoc-in-digital-twin-and-co-simulation-1/
- Jim evaluation to be completed this week
- Monday the Technicon equipment will arrive at Skejby
- Carlos to be at Skejby
- Kenneth contract is now in place and working 1/3 of his time
- Camera ready versions are being produced for the Overture workshop
- Peter is to meet with Nick on Friday target is to get the VDM-SL model of the static analysis of FMUs aligned with the initial dynamic semantics analysis conducted by Cláudio
PGL proposed to type meetings, so absent members can read what was discussed. Everybody agreed.
Any Other Business
None.
Next Meeting
04 September 2019, 1030 CET